Since its foundation in the 1970’s over 10 million cubic meters has been supplied to ventures in both the public and private sectors.
Outstanding Service
You Can Rely On
Haji Hassan Readymix is the oldest and most trusted ready mixed concrete supplier in Bahrain.
Outstanding Service
You Can Rely On
Since its foundation in the 1970’s over 10 million cubic meters has been supplied to ventures in both the public and private sectors.
Outstanding Service
You Can Rely On
To be the most trusted provider of concrete solutions in the Kingdom Of Bahrain.
To create confidence in all interested parties by providing reliable services in a professional, innovative and sustainable manner.
Company Overview
Haji Hassan Readymix is the oldest and most trusted ready mixed concrete supplier in Bahrain. HHRM is an integral part of modern day Bahrain’s history. So much so that Haji Hassan projects are illustrated on every denomination of Bahrain’s currency.
Since its foundation in the 1970’s over 10 million cubic meters has been supplied to ventures in both the public and private sectors; developments range from the most complex and challenging undertakings that require hundreds of thousands of cubic meters, down to the simpler, smaller projects and private residences.
The experienced and productive team of 250 well- trained staff (supported by Group Finance, Human Resources, IT, Health and Safety Departments) operates 4 concrete plants and all necessary ancillary production facilities strategically located in Bahrain to minimize travel times.
HHRM’s vision and mission demands sourcing of the best available materials and use of top-brand pumps and mixers under a strict preventative maintenance regime.
Stringent quality control of constituents and fully computerized batching gives every interested party confidence in supply.
Full compliance with a third party approved Quality Assurance Scheme based on the latest European Standards assures product conformity (recently resulting in the Quality Excellence Award from Bahrain Airport Company/Hill International for supplies to the Airport Modernisation).
DUNS-registered HHRM is consequently approved everywhere, from Ministries to Milcon, BDF to BAPCO,ALBA to GIIC and anywhere in between. Project approvals are easier when backed by HHRM’s reputation.
The Group’s strength across all divisions lies in the prioritization of quality and service. For HHRM it pushes them to the front of the queue for high profile, time-sensitive projects.
Company Milestones - Over 40 Years of History and Expertise
First placing boom and stationary pump.
ISO9001:2008
HHRM supplies the majority of concrete to Bahrain’s largest pour (8,459m3).
Production exceeds 500,000m3 in this year (including: Two pours exceeding 3,000m3).
Entire floor slabs for IKEA poured in 8 weeks (20,000m3).
Purpose-built central workshop constructed to meet the needs of a huge mobile fleet of pumps and mixers, to comply with Environmental Legislation and ensure the Health, Safety and welfare of staff.
New 75t flaked ice plant increases temperature-controlled output in summer by 3,500m3/day.
ISO 45001: 2018 accreditation awarded.
Certification from Bahrain Civil Defence awarded.
Immediate action to duplicate management team at different locations to minimise the effect of COVID.
Sand washing capacity increased by 100t/hr with thickening system to significantly reduce and control discharge.
“Made in Bahrain” trademark adopted to reflect national pride and support.
New-look website launched to give a better experience and service.
Meet Our Team
Strict quality control and standards.
Our Products
Haji Hassan Kerbs are produced under a controlled Quality Management system to ensure compliance with BS EN 1339 & 1340.
The leading supplier of high quality Double Washed Marine Sand and related products in the Kingdom of Bahrain.
Haji Hassan Readymix produces concrete spacers with a guaranteed C50 performance.
Our Services
HHRM operates four concrete batching plants in Salmabad and RasZuwayed (Opposite Alba).
Concrete temperature control is achieved through the onsite KTI water chilling plant.
Haji Hassan Ready Mix has its own laboratories at every plant location performing all testing...
Bahrain's Best and Most Trusted
Our Projects Portfolio
Shaikh Khalifa Bin Salman Causeway Bridge Project
Shaikh Khalifa Bin Salman Causeway Bridge Project
The USD 45 million Sheikh Khalifa Bin Salman Causeway Highway involved the construction of a 404 m marine bridge as part of a causeway linking Hidd to Manama with a length of 6.4 km consisting of 3 lanes going towards each direction and footpaths on either side.
Site batch facility provided in a remote location at short notice to rescue a project from growing delays.
Cubic Meters – 40,000
Main Contractor –Besix – Haji Hassan J.V.
Bahrain International Circuit
Bahrain International Circuit
BAE and HHRM combine to create world class drag strip at BIC. Special low-bleed, non-settling, low shrinkage mix design provides the surface flatness required for safety at record speeds.
Main Contractor – Bahrain Asphalt
Sitra Causeway Project
Sitra Causeway Project
Roads, Bridges and post-tensioned fly-overs running almost 5km from Umm Al Hassam Junction to the Industrial Area in Sitra. More than 250,000 m3 meeting design life >200years poured by the project’s sole concrete supplier, HHRM.
Cubic Meters – 250,000
Main Contractor – GAMUDA
Villamar Towers
Villamar Towers
The project comprises the construction of three towers in Bahrain Financial Harbour. Tower A is 54 storeys high and 220 metres in height. Tower B has 43 storeys and is 137 metres high. Tower C goes up 52 storeys and reaches a height of 210 metres. Each tower has a twisting design sheathed in mirrored green glass to match the adjacent BFH Towers. The total living area created is 35,900 square metres and the predicted population is around 2,000 people.
Main Contractor – Al Hamad Contracting Company
Abraj Al Lulu Towers
Abraj Al Lulu Towers
The Abraj Al Lulu is a large residential development located in Manama, the capital city of Bahrain. The entire complex consists of three large towers, two of which have 50 floors and one with 40. The three towers (Gold Pearl, Silver Pearl and the Black Pearl) are located next to the King Faisal Highway, which is close to popular places such as the Bahrain City Centre Mall, Central Market, Bahrain World Trade Centre and the Bahrain Financial Harbor. The entire complex covers a land area in excess of 23,230 m2 (250,000 sq ft).
Haji Hassan Readymix finished all three of the towers.
Main Contractor – Al Hamad Contracting Company
City Center Bahrain
City Center Bahrain
Haji Hassan Readymix supplied more than 50% of concrete for the structural requirement of Bahrain City Center.
Bahrain City Centre Mall is a world class retail and leisure complex located in the Kingdom’s capital city, Manama. As well as 207,000m² retail space, two luxury hotels, an energy centre, a 20 screen cinema and multi-storey car park, the complex includes a dramatic 40m high glazed atrium roof and the Middle East’s largest indoor climate controlled water park.
Main Contractor – Cebarco Bahrain
North Manama Causeway
North Manama Causeway
The longest raised causeway in Bahrain at over 1.4km long. 60,000m3 of precast bridge segments as part of over 140,000 m3 poured by the project’s sole supplier, HHRM.
Cubic Meters – 140,000
Main Contractor – Six Constrct, Haji Hassan Group & Rizzani De Eccher
1560 Houses at Southern Governorate.
1560 Houses at Southern Governorate.
Cubic Meters – 140,000
Main Contractor – Tamcon Contracting
Bahrain International Airport Modernisation Program
Bahrain International Airport Modernisation Program
The project aims at elevating the Bahrain International Airport infrastructure and services. The initial expansion phase is expected to increase the airport’s capacity from 9 to 14 million passengers per year.
Haji Hassan Readymix Supplied over 200,000m3 of high durability piling concrete & structural concrete for Main Terminal and Central Utility Control buildings. Service earns the sole supplier HHRM a Quality award from the client and consultant engineer.
Cubic Meters – 200,000
Main Contractor – Arabtec TAV JV
Four Season Hotel
Four Season Hotel
From a raft foundation comprising 7,500m3 low heat concrete to high rise superstructure, over 55,000 m3 supplied by HHRM from 2 site-batch plants on Bahrain Bay.
Cubic Meters – 55,000
Main Contractor – Six Construct
424 Villas at East Hidd
424 Villas at East Hidd
The Project comprises the construction and maintenance of 425 villas at East Hidd. The development is split into nine zones comprising 4070 villas and 500 gifted plots.
Cubic Meters – 20,000
Main Contractor – Dar Al Khleej Trading and Contracting
Al Ramli Housing Project Phase II
Al Ramli Housing Project Phase II
Al Ramli Project is a social housing project located in the central part of Bahrain, close to Salmabad and A’ali village.
The project consist of 1265 housing units.
Haji Hassan Supplied over 70,000m3 of concrete from Salmabad batching plants.
Cubic Meters – 70,000
Main Contractor – CM.A.Y AL MEZEAL Construction & Al Nasir Contracting
Shaikh Khalifa Bin Salman Widening Project
Shaikh Khalifa Bin Salman Widening Project
SKBS Highway is one of the most important strategic arterial roads of the Kingdom of Bahrain that offers connectivity between Manama, Hamad Town and the Southern Governorate. The project stretch is about 23.5km with an overall 12 junctions. Total road length 5,100m including widening of the existing carriageway to 4 lanes, milling and re-profiling of existing and provision of shoulders.
Cubic Meters – 15,912
Main Contractor – Alghanim International
GIIC Pellet Plant
GIIC Pellet Plant
The project involve expansion of a new $300-million plant to take total capacity to 9.1 million tonnes per year (tpy) from 4 million tpy now.
Date – 2006 – 2008
Main Contractor – Jurong Engineering Limited
IKEA Bahrain
IKEA Bahrain
HHRM is sole supplier for the biggest IKEA store in the gulf region. The store, located in Salmabad, will have a total retail area of 37,000 sq m and an investment of BD47 million ($124.76 million).
Over 40,000 m3. A project way behind schedule but with a fixed store openimg date. HHRM is called in at short notice as sole supplier for over 40,000 m3 in less than 4 months.
Cubic Meters – 40,000
Main Contractor – Kooheji Contractors
Shaikh Isa Causeway Bridge Project
Shaikh Isa Causeway Bridge Project
The Causeway connects North Muharraq with the Diplomatic Area in the northern part of Manama. The design of the bridge with two sail-like structures was chosen to depict Bahrain’s traditional pearl diving culture. The 2.5km causeway was opened for traffic on 4 Jan 1997.
Main Contractor – Archirodon-Bahrain Asphalt
Al Dur Power Plant
Al Dur Power Plant
The project involve expansion of a new $300-million plant to take total capacity to 9.1 million tonnes per year (tpy) from 4 million tpy now.
Date – 2009 – 2012
Main Contractor – Hyundai Heavy Industries
Fontana Gardens
Fontana Gardens
Constructed by Kooheji Contractors, this turnkey, high-rise project consists of three towers (Tower A: 39 floors, Tower B: 39 floors and Tower C: 30 floors). Total Built-up Area is approximately. 104,100 square meters. With a basement, ground floor and a 3-level parking, it has 413 luxury apartment units.
Cubic Meters – 65,000
Main Contractor – Kooheji Contractors
Danat Al Baraka 211 Villas
Danat Al Baraka 211 Villas
The “Danat Al Baraka” project includes 211 villas with four different contemporary designs. It is built on a land of 73,514 square meters in Janusan.
Date – 2018 – 2019
Cubic Meters – 13,322
Main Contractor – Ahmed Omer Trading & Contracting
Madinat Salman Sewage Treatment Plant
Madinat Salman Sewage Treatment Plant
The project is a new 40,000 cubic-metre a-day sewage treatment plant for Al-Madina al-Shamaliya, a new town being built on 750 hectares of reclaimed land that will have a population of over 90,000 once complete.
Cubic Meters – 14,000
Main Contractor – VA Tech Wabag-Belhasa Projects JV
152 Town Houses, Malkiya
152 Town Houses, Malkiya
The project includes construction of 152 houses for Ministry of Housing at Malkiya.
Date – 2011 – 2013
Cubic Meters – 16,000
Main Contractor – Technical Construction Company W.L.L
AMAS Access Bridge
AMAS Access Bridge
Construction of new 4 lane dual carriageway with a grade signalized junction on Avenue 36 / W-link junction including proposed new Bridge construction on sea channel connecting AMAS with the main land in Bahrain.
Total Bridge Length: 150 meters North & South Bridge with USD 21 million project value.
Cubic Meters – 20,000
Main Contractor – Alghanim International – Haji Hassan J.V.
316 Houses at Madinat Salman – AMAS
316 Houses at Madinat Salman – AMAS
The project includes constructon of 316 houses for Ministry of Housing at Madinat Salman – Al Madina Al Shamaliya.
Date – 2014 – 2015
Cubic Meters – 35,000
Main Contractor – Tamcon Contracting Company
Bahrain’s Sheikh Zayed Road Project
Bahrain’s Sheikh Zayed Road Project
The project involve development of the Sheikh Zayed Highway extension (Phase 1) in Bahrain which expanded various streets to three lanes in each direction with a length of 3.2 km that will extend from Shaikh Khalifa bin Salman Street in the west to the Driving Training School in the east and the roundabouts.
The highway capacity increased to 80,000 vehicles per day and 11,000 vehicles during peak hours.
Cubic Meters – 20,000
Main Contractor – Bainoona – Bahrain Asphalt
New Exhibition & Convention Centre at Sakhir
New Exhibition & Convention Centre at Sakhir
Haji Hassan Readymix is the main concrete supplier to Bahrain’s State-of-the-art New Exhibition & Convention Centre, Sakhir.
More than 70,000 m3 of temperature controlled concrete supplied required 4 batching plants, massive ice capacity, over 60 Concrete Mixers and 19 concrete pumps to complete pours exceeding 5,700m3 in a single shift.
The unique concrete mix design was specially approved by the Ministry of Works to overcome issues with substructures over 3.5m deep.
Cubic Meters – 111,000
Main Contractor – Cebarco Bahrain
BAPCO Modernization Program (BMP)
BAPCO Modernization Program (BMP)
Specification errors resolved by HHRM to ensure client received the quality of concrete required.
Main Contractor – Nasser Saeed Al Hajri
Cubic Meters – 70,000
ONYX Bahrain Bay
ONYX Bahrain Bay
Standing just a short distance from the Arabian Gulf, the project consists of a twin tower (Tower A:45 storey and Tower-B 40 storey) located at Bahrain Bay, Manama.
C60/75 concrete, selfcompacting concrete, waterproof concrete, screeds and concrete for posttensioned thin slabs have been designed and supplied in close collaboration with Kooheji and the engineering consultants.
4 batching plants each with massive ice capacity were required to keep concrete temperature below 28C whilst ambient temperature exceeded 45C.
Cubic Meters – 81,000
Main Contractor – Kooheji Contractors
Fontana Infinity
Fontana Infinity
The project consists of 43-storey twin towers a total built up area of approximately 125,000 sqm. One of the 3 ‘Fontana’ developments in Juffair consisting of >120,000m3 for 6 towers, all requiring high pressure concrete pumps and special mix designs.
Cubic Meters – 60,000
Main Contractor – Kooheji Contractors
ALBA Line 6 Expansion
ALBA Line 6 Expansion
The pride of the Kingdom of Bahrain, the Line 6 Expansion Project will make Alba the world’s largest Aluminium smelter.
Alba’s Line 6 Expansion Project is one of the biggest brownfield developments in the Middle East Region.
More than 50,000m3 supplied for a specialised industrial process requiring many unusual concrete solutions including heat insulation, low-strength back-fill, lightweight foamed concrete, high temperature-resistance.
Cubic Meters – 50,000
Main Contractor – Nasser S. Al Hajri
VITA Tower, Juffair
VITA Tower, Juffair
Date – 2017 – 2018
Cubic Meters – 13,000
Main Contractor – Yousif Abdul Jaleel Real Estate
Our Clients
QHSE Policy
Quality, Environmental, and Occupational Health & Safety Policy
Haji Hassan Group (HHG) upholds a 60+ year reputation for quality and professionalism in the infrastructure and industrial industry. We are committed to continuous improvement to ensure client satisfaction and sustain our distinguished reputation.
Our Integrated Management System (IMS) complies with ISO 9001:2015 for Quality, ISO 14001:2015 for Environmental Management, and ISO 45001:2018 for Occupational Health & Safety standards to:
Exceed client expectations;
Continuously improve work methods and procedures;
Enhance communication at all levels;
Allocate resources effectively;
Ensure compliance with legal and regulatory requirements;
Reduce energy consumption, waste, and harmful emissions;
Safely dispose of hazardous waste;
Prevent injury and illness.
HHG remains a leader in delivering exceptional quality, efficiency, and reliability. This policy is communicated to all stakeholders, with every employee responsible for compliance with rules and statutory obligations.
Call Us
+973 1778 5353
Email Us
readymix@hajihassan.com
Fax Us
+973 1791 0344