Home News & Events Mina Salman Interchange
Mina Salman Interchange

When the contractor could not use cooling pipes to control the temperature in a 2.8m thick concrete pour, the main concrete supplier could not provide an acceptable proposal. Haji Hassan Readymix’s proposal on how to keep internal concrete temperature below 70°C was accepted. The pour was successfully completed overnight on 5th/6th October 2012 using a special triple blend of cement in concrete supplied at a maximum 22°C.