Only 0.3m3 of fast-setting high durability concrete was required for a sewer sump repair. Haji Hassan Readymix identified the best solution was a carefully-controlled site mixing operation and gave a detailed procedure. The instructions were given by volume so that site staff could accurately batch the mix using containers on site. Project Manager, Ali Al Badeaa, wrote

It went very well we managed to cast and complete the work ahead of time and the Ministry of Works Representatives Engineers and the Consulting Engineers were satisfied about the Mix and the timing of hardness as per your instruction. We thank you for the design and supply (of materials)

Although there was no contribution to our profits we did make another satisfied ‘customer’. The parent company, Al Hassanain Construction, has just poured over 10,000m3 concrete from Haji Hassan Readymix to successfully complete the culverts on Al Madinat Al Shamaliya – Bahrain’s largest current land reclamation and housing development scheme.